ELENA Transfer Lines Workshop
Wednesday 25 January 2012 -
09:00
Monday 23 January 2012
Tuesday 24 January 2012
Wednesday 25 January 2012
09:00
ELENA Introduction
-
Stephan Maury
(
CERN
)
ELENA Introduction
Stephan Maury
(
CERN
)
09:00 - 09:15
Room: 864/1-D02 - BE Auditorium Prevessin
09:15
Present Transfer Line status
-
Pavel Belochitskii
(
CERN
)
Present Transfer Line status
Pavel Belochitskii
(
CERN
)
09:15 - 09:45
Room: 864/1-D02 - BE Auditorium Prevessin
Injection line Extraction positions to existing and new experimental area Beam parameters at extraction Operational considerations (harmonic at extraction, how many bunches per pulse extracted, time between extractions, switching time)
09:45
Integration constraints and experimental areas
-
Francois Butin
(
CERN
)
Integration constraints and experimental areas
Francois Butin
(
CERN
)
09:45 - 10:15
Room: 864/1-D02 - BE Auditorium Prevessin
Geometric constraints Radioactive shielding
10:15
Coffee break
Coffee break
10:15 - 10:45
Room: 864/1-D02 - BE Auditorium Prevessin
10:45
ISOLDE operation with electrostatic Transfer Lines
-
Fredrik John Carl Wenander
(
CERN
)
ISOLDE operation with electrostatic Transfer Lines
Fredrik John Carl Wenander
(
CERN
)
10:45 - 11:15
Room: 864/1-D02 - BE Auditorium Prevessin
11:15
Power supplies for ISOLDE operation
-
David Nisbet
(
CERN
)
Power supplies for ISOLDE operation
David Nisbet
(
CERN
)
11:15 - 11:45
Room: 864/1-D02 - BE Auditorium Prevessin
Existing system at ISOLDE What EPC would like to avoid at ELENA Constraints from EPC side
11:45
Lunch break
Lunch break
11:45 - 13:30
13:30
Modelling of electrostatic lines
-
Tim Giles
(
CERN
)
Modelling of electrostatic lines
Tim Giles
(
CERN
)
13:30 - 14:00
Room: 864/1-D02 - BE Auditorium Prevessin
Simulation of electrostatic transfer lines Scaling of PC voltages from ISOLDE to ELENA Beam instrumentation Design of electrostatic elements
14:00
Experience with electrostatic beam lines at Cockroft
-
Carsten Welsch
(
Max-Planck-Gesellschaft (DE)
)
Experience with electrostatic beam lines at Cockroft
Carsten Welsch
(
Max-Planck-Gesellschaft (DE)
)
14:00 - 14:30
Room: 864/1-D02 - BE Auditorium Prevessin
Hardware design Optics design of electrostatic lines Beam instrumentation
14:30
Electrostatic deflectors and lenses
-
Dani Barna
(
Department of Physics
)
Electrostatic deflectors and lenses
Dani Barna
(
Department of Physics
)
14:30 - 15:00
Room: 864/1-D02 - BE Auditorium Prevessin
15:00
Coffee break
Coffee break
15:00 - 15:30
Room: 864/1-D02 - BE Auditorium Prevessin
15:30
Beam instrumentation for low energy transfer lines
-
Masaki Hori
(
Max-Planck Institute of Quantum Optics (DE)
)
Beam instrumentation for low energy transfer lines
Masaki Hori
(
Max-Planck Institute of Quantum Optics (DE)
)
15:30 - 16:00
Room: 864/1-D02 - BE Auditorium Prevessin
16:00
Experiments’ wishes and structure of Transfer Line workpackage
-
Wolfgang Bartmann
(
CERN
)
Experiments’ wishes and structure of Transfer Line workpackage
Wolfgang Bartmann
(
CERN
)
16:00 - 16:30
Room: 864/1-D02 - BE Auditorium Prevessin
Required beam parameters (transverse, longitudinal) Tunability, stability
16:30
16:30 - 17:30
Room: 864/1-D02 - BE Auditorium Prevessin