EN-THE: Mise à jour du tableau d'intégration (Titouan) et mise à jour modèle 3D

EN-CV: Nina in contact with supplier for the ventilation update (B.170 et B.738)

Station de refroidissement des dumps - attente retour de RP pour finaliser intégration

Stefano: Inspection week 39: voir si la trappe peut être modifiée  / inspection RP si possible

Ajouter tube de drainage entre le dump et la trappe en zone cible

EN-CV could check the last version for the ventilation distribution

SCE would bring some 3D model update

Update should be done for the access stairs: sharing model with V.Barozier for integration

EN-ACE: V.Barozier in contact with James for the simulation comparison: james.dilwyn.devine@cern.ch

Check the walkway from isoltrap: see on the 3D scan

EN-CV: asking BC and timeline for this project -> Kara should bring some details (estimation September 2027)

SCE: Tiago should be contacted to bring update on this project