Rolandas Naujikas 1-15 May 2006 == Major work for BalticGrid Testing of sites with SFT. == Major work for GD-OPS == Major work for GD-ITR gLite 3.0.0 WMS testing of tcp port range problems. Relocatable gLite 3.0.0 TAR testing. == Major issues arising == Major events attended (include links to event/presentation) == Plans to attend/organize major events (intra-EGEE and others) == Holidays during the period 1 days 16-31 May 2006 == Major work for BalticGrid Testing of sites with SFT. SFT upgrade to CVS HEAD version. Created APEL configuration for sites without own MONBOX. == Major work for GD-OPS Supporting of PPS VOBOX. == Major work for GD-ITR gLite 3.0.0 WMS testing of tcp port range problems. == Major issues arising == Major events attended (include links to event/presentation) == Plans to attend/organize major events (intra-EGEE and others) == Holidays during the period 0 days