Konstantin Skaburskas 1-15 May 2006 == Major work for Health-e-Child Install/conf of HeC test bed (gLite 3.0): -- core services at MaatG (VOMS/PX, topBDII/WMSLB/LFC) == Major work for GD-OPS Upgrading of FTS, gliteCE to gLite 3.0RC2 == Major work for GD-ITR Upgrading of some nodes on Certification test bed. == Major issues arising == Major events attended (include links to event/presentation) Telephone meeting with Siemens at MaatG. == Plans to attend/organize major events (intra-EGEE and others) Preparation for participation in HeC workshop 30.May-02.June. == Holidays during the period 0 days -------------------------------------------------------------- 16-31 May 2006 == Major work for Health-e-Child Install/conf of HeC test bed (gLite 3.0): -- site at CERN representing a "hospital" (gliteCE/Torque/WN, siteBDII/DPM) -- UI on Gentoo (for making presentation at HeC workshop) Preparation of tests to be shown at HeC workshop. Tuning of the installed test bed. Consulting UWE with respect to install/conf of a site. == Major work for GD-OPS Install/conf of new FTS Oracle (testing of YAIM procedure) from gLite 3.0RC5. == Major work for GD-ITR Testing of gLite TAR_UI and TAR_WN. == Major issues arising == Major events attended (include links to event/presentation) May 31 - remotely attended HeC workshops's WP5 meeting. == Plans to attend/organize major events (intra-EGEE and others) Preparation for participation in HeC workshop 30.May-02.June. == Holidays during the period 3 days