Alexandre Duarte November, 2006 Major work for EELA; major changes in workplan ---------------------------------------------------------------- Presentation about EELA to to John Shade - (03/11) Preparation for the EELA ROC Manager Tutorial Preparation for the EELA GRID School SAM Maintenance EELA Operation Major work for GD-OPS major changes in workplan ---------------------------------------------------------------- ROC on Duty (02/11 to 03/11) ROC on Duty (13/11 to 17/11) ROC on Duty (20/11 to 24/11) CIC on Duty (20/11 to 24/11) Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- COD-11 Meetings (07/11 to 09/11 - http://indico.cern.ch/conferenceDisplay.py?confId=a063361) EELA ROC Managers Tutorial (29/11 to 01/12 - http://indico.eu-eela.org/conferenceTimeTable.py?confId=71) Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- First EELA GRID School (04/12 to 15/12 - http://indico.eu-eela.org/conferenceTimeTable.py?confId=60 Holidays during the period ------------------------------------------------------------ 0 TimeSheet for the month ------------------------------------------------------------ WP2/T2.1 20% WP2/T2.3.1 30% WP2/T2.3.2 20% Wp4/T4.2: 30% Infrastructure status ------------------------------------------------------------ # of sites in project - 12 # of sites contributing to the EGEE production infrastructure - # of cpus - 566 total SE 7,82 TB ************************************************************