Domenico Vicinanza December, 2006 Major work for EUMEDGRID; major changes in workplan ---------------------------------------------------------------- - SAM Server installation for EUMEDGRID project completed. SAM server, hosted in Malta at https://sam.grid.cs.um.edu.mt/sam/sam.py is up and running, monitoring EUMEDGRID middleware since December 8th - Regarding WISDOM (World-wide In Silico Docking On Malaria): -- successfully tested a few (20) complete WISDOM jobs following up all the workflow -- Updated results from the Malaria Data Challenge (October 1st, December 15th) available at http://wisdom-dc-helsinki.healthgrid.org Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- - WMS test written by Hui Min Lin fully integrated within the SAM environment and available on the Cern Certification Testbed at the page: https://lxb0714.cern.ch/sam/sam.py?sensors=gRB&regions=CTB&regions=Default&vo=dteam&order=SiteName&funct=ShowSens orTests - Working on the "Adding new tests and publishing test results with SAM" manual adding other use cases - Still revising editing the "SAM Server Installation and Configuration with Oracle Express" manual for developers and site managers - Supporting SAM installation, configuration and maintainance for EUMEDGRID - Attended two SAM Team Meetings Major issues arising -------------------- - WISDOM is now under systematic testing, launching bunch of 20 long jobs whose jdl were created on the fly by a PERL script on the UI. - A SAM documentation workplan is going to be finalized, structuring a multi-layered documentation (for users/administrators/developers). Major events attended (include links to event/presentation) --------------------- Attended the EUMEDGRID PMB within the "1er Workshop & Tutorial EUMEDGRID à Marrakech" Marrakech, Morocco. Agenda available at: http://www.magrid.ma/index.php?option=com_content&task=view&id=33&Itemid=88 Minutes available on INDICO at http://indico.cern.ch/conferenceDisplay.py?confId=9869 Attended the first two SAM Team meetings as resposible for SAM documentation Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 0 days TimeSheet for the month ------------------------------------------------------------ WP3/A3.2 and 4.3 70% WP4/A4.2 and 4.3 30% Infrastructure status ------------------------------------------------------------ # of sites in project: 10 (6 Mediterranean Countries) # of sites contributing to the EGEE production infrastructure: # of CPUs: 353 total SE: 22 total RB: 5 total FTS: 0 total LFC: 1 total Local LFC: 1 ************************************************************