Dusan Vudragovic December, 2006 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- * Analyses of Deliverable D3.1a * Presentation about HGSM SEE-GRID tool to Rolandas (Baltic grid) * Start preparation materials for WLCG Workshop with Antun * Look for problems in SEE-GRID SAM installation Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- * Finish SAM server installation * Finish SAM client installation * Testing SAM installation * Analyses of SAM test * Improve exist and create new SAM test descriptions at GOC wiki and LCG wiki pages * Update SAM test help link at SAM CVS * SAM support Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- WLCG Collaboration Workshop (22-26 January 2007) Holidays during the period ------------------------------------------------------------ 0 days TimeSheet for the month ------------------------------------------------------------ 1A4 20% 1A5 10% A31 70% Infrastructure status ------------------------------------------------------------ 29 of sites in project 10 of sites contributing to the EGEE production infrastructure 648 of cpus 15.31TB total SE