MERIT safety pre-hearing of transport and installation
→
Europe/Zurich
SALLE B (61-1-009) (CERN)
SALLE B (61-1-009)
CERN
Description
The transport tools and installation operations of the mercury loop and the solenoid shall be reviewed.