Attendees: D. Hay, N. Gilbert, J-M. Lacroix, R. Froeschl, J. Cole, D. Bodart, E. Urrutia, B. Riffaud, A. Dallocchio, J. Tan, V. Raginel, F. Loprete, A. Perillo-Marcone, A. Sarrió.
Absents: C. Bertone, Y. Bernard, T. Wijnands, A. Newborough, Y. Algoet, G. Mason, K. Hanke, B. Mikulec, O. Aberle, J. Hansen, T. Dobers, A-P. Bernardes.
INTRODUCTION:
The aim of the meeting was to inform all participants about the structure EN-STI-TCD is planning to design and install in the PSB dump area, before starting any work.
The new structure is a replacement for the yellow column supporting the BTY-QFO 108 magnet, which stands in front of the dump cavity and is currently blocking its access.
The proposal consists of a three-foot metallic structure and its functions are: