Key dates:
Action list: Pascal: 1- Modify Metallic structure to include TIG welding. 2 Request and prepare Fire permit, IS37 3- Supervise & declare RP metalic dust and waste management. Eric 1- Provide lifting and handling support. Tech Coordination 1 Locate the owner of the fiber optics connection box and arrange for temporary removal during welding process. |