Minutes of the 23rd WP2 Task Leader Meeting held on 31/01/2014

Present: G. Arduini, V. Baglin, O. Brüning, F. Cerutti, R. De Maria, L. Esposito, M. Giovannozzi, P. Fessia, E. Métral, T. Pieloni, A. Valishev, A. Wolski, S. Weisz.

General information (Gianluigi)

 

Update on energy deposition studies for the Matching Section – L. Esposito

Luigi presented an update of the energy deposition studies taking into account the constraints evidenced by the integration studies performed and presented during a meeting organized by P. Fessia on 29/11/2013. In particular:

The results can be summarized as follows:

 

Sylvain suggested studying tolerances to misalignments of the mask (of the order of 1 mm).

Riccardo asked whether it is possible to distinguish the dependence on energy deposition of the increased distance of the mask from that on the length of the mask.

Oliver asked whether the peak power deposited depends on ß*. Luigi replied that the crossing angle is the most relevant parameter.

P. Fessia suggested investigating the possibility of installing the D2 correctors on the IP side of D2 with additional shielding to save both space in between D2 and Q4 and protect more D2 who became the weakest point.

G. Arduini replied that this possible suggestion will be added to the “desiderata” for the optimization of the layout of the matching section.

As a general comment, P. Fessia, asked WP2 if could provide the sensitivity of the required crab cavity voltage for a given beam tilting angle at the IP as a function of the crab cavity longitudinal positions. Massimo clarified, that moving D2 towards the IP would imply a larger aperture and it goes against the desiderata of magnet builders. Informations on the beam screen of D2 are still missing. Action: Ezio.

 

Updates from Task Leaders – O. Brüning, M. Giovannozzi, E. Métral, T. Pieloni, A. Valishev

Task 2.2 (Massimo)

Maxim Korostelev has progressed with squeeze sequence terminating the round optics squeeze and he will continue for another month on the other sets.

Task 2.3 (Massimo)

Yuri Nosochkov is studying the dynamic aperture at injection. A slight decrease of the dynamic aperture has been observed but it is not due to the new insertion element. He is investigating whether this is the result of the change of integer.

Riccardo has generated the tracking tools HL-LHCV1.0. These are now under validation.

A model for a long range beam-beam wire compensator is available in SixTrack but needs to be debugged.

An e-lens model is available in the collimation routine but not yet for long term tracking studies.

Task 2.4 (Elias)

New impedance model for the LHC and HL-LHC has been used for providing first new estimates of the single beams stability limits. This has been presented at the task 2.4 meeting on 22/1/2014 (indico.cern.ch/conferenceDisplay.py?confId=296269).

Task 2.5 (Tatiana)

Two issues were found the in the 6D beam-beam lens in SixTrack. The number of slices were limited to a maximum of 15 and the values of the beam sigmas of the slices calculated in the 6D lens were not properly calculated when the lhc=2 option (taking the beam sizes for the long-range kicks from MadX and required to estimate correctly long-range effects for flat beams) was used. The behaviour has been corrected (the max number of slices has been moved to 99) and the fixes should be incorporated in the production version of SixTrack. The tests and the content of the 6D beam-beam lens algorithm are being documented. It must be noted that for the time being the beam sizes used by the 6D beam lens are calculated partially by SixTrack using the weak beam optics and partially taken as input (e.g. calculated by the MADX mask file). This will be changed in the future. Action: Beam-beam team.

Oliver suggested generating an output file with all the input parameters used for the simulations (e.g. number of slices) so to ease debugging. This should be implemented as part of SixTrack in general. Riccardo replied that it is already the case at least for most of the input parameter, but he will check if the output is exhaustive. Action: Riccardo. (After the meeting it was checked that the number of slices is correctly reported in the output file and that a warning is being issued when a reset to 15 slices occurs.)

Task 2.6 (Oliver)

Nothing to report.

Future topics will be:

 

Reported by Gianluigi and Riccardo.