Performance Tests During the IBL Stave Integration

4 Sept 2014, 12:20
25m
Niagara Falls, Canada

Niagara Falls, Canada

Sheraton on the Falls

Speaker

Jennifer Jentzsch (Technische Universitaet Dortmund (DE))

Description

In preparation of the ATLAS Pixel Insertable B-Layer integration, two detector components, so called staves, were mounted around the Beryllium ATLAS beam pipe and tested using production quality assurance measurements as well as dedicated data taking runs to validate a correct grounding and shielding schema. Each stave consists of 32 FE-I4 readout chips of ~ 2x2cm size which sums up to over 860k pixels per stave. The integration tests include verification that neither the silicon n-in-n nor the silicon 3D sensors were damaged by mechanical stress, and that their readout chips, including their bump bond and wire bond connections, did not suffered from the integration process. Evolution of the IBL performance during its integration will be discussed as well as its final performance before installation

Primary author

Jennifer Jentzsch (Technische Universitaet Dortmund (DE))

Presentation materials