The next BI/TB will focus on actions taken following the Evian and Chamonix work-shops for LHC beam-instrumentation systems. The idea of this TB is to ensure the developments are coordinated and that plans for the recommissioning after the long LS1 are documented such that requests can be made visible in the schedule.

1) Introduction (Enrico)

- Need for 'quick' overview for each system

(meeting proposed next week with Hermann, Michael, Enrico, David, Bernd, L. Jensen)

- Existing JIRA tools proposed to keep track of upgrades

- Enrico to inform us of commissioning plans and communicate between LHC-OP and BI

2) LHC BLM (Christos)

- Reset of BLM electronics in tunnel, need agreement for who can do it and how/when

- Firmware upgrade required for BLMTC module (DAB) for faster read-out of thresholds (VME)

3) LHC BPM (Thibaut)

- Several BPMs added (BGI and TOTEM)

- Interlocked BPMs still not decided what to do in terms of gain switching - needs OP/ABP/ABT meeting

- Issues for new firmware for normal and interlock (meeting today with Andrea).

- BI/SW to estimate the effort of making the changes to low-level software classes (Guillaume, Lars)

4) DC BCT (Patrick/Michael)

- No changes made to tunnel electronics for start-up. By-pass would require 30 mins access to install if required.

- Decision pending for choice of 'operational DC BCT' system between VD80 and ADC-24 bits (Patrick, Michael, Lars * 2) expected for Thursday 11/12/14

- Small meeting required for best handling of lifetime for OP (Hermann et al)