Shawn
- Open ticket on some step09 files, size mismatch. Checked - but differing with Rucio. Suspect a casualty of Rucio deployment. Checksums match! Saul has observed at other sites, and reported.
- Getting some equipment (35 Dell R620's, were part of a large order that got cancelled). 256GB memory, dual 10g nics, redundant PS, E5-2670v2 (10C).
- Storage MD3460 storage shelf at MSU. UM 600 TB MD3060s, 6TB, Lustre over ZFS.