ops update
***************
- A new dedicated instance of the SAM database for the PPS has been setup (fixes emerging incompatibiliity)
- CREAM CEs now at CNAF and FZK PPS sites. Publishing these into the production BDII and involving the experiments starts from today. [more information and links https://twiki.cern.ch/twiki/bin/view/LCG/OpsMeetingPps]
- PPS (3.1) update 31 available soon. It includes glexec installation and configuration patches. 3.0 update 50 went to PPS on 23rd June and conatins a gLite-FTA fix.
- Do we have experience with multi-valued LCG_GFAL-INFORSYS? (CE) Suggestion for extending the SAM RM test timeout.
- CE noted that GGUS:37754 indicates that SE downtime is correctly handled by SAM but not in GridView visualisation.
- DECH Do generic linux or torque/maui configurations or tools exist to prevent use of site resources for DOS (e.g. memory fork bomb on gLite-WN.
- IN2P3? suffered from >30,000 ATLAS jobs hitting site. Unclear if internal submission and whether jobs were sucked in or targetted. [Aside: Job load spikes seem to becoming a regular Grid feature!]
- T1s have now deployed FTM
- IN2P3 gsidcap file access problem (GGUS:36625) was traced to scrw up in the global GSI environment with multiple connections to the same gsidcap door.
- Reminder of baseline storage versions https://twiki.cern.ch/twiki/bin/view/LCG/GSSDCCRCBaseVersions.
- EGI workshop taking place at CERN: http://www.eu-egi.eu/workshop/jun08
WLCG update
*****************
There is a GDB next week: http://indico.cern.ch/conferenceDisplay.py?confId=20231.
Ticket status
***************
https://gus.fzk.de/download/escalationreports/roc/html/20080630_EscalationReport_ROCs.html