2nd International Review of the HL-LHC 11 T Dipole for DS Collimation

from Monday 8 December 2014 (08:15) to Wednesday 10 December 2014 (12:30)
CERN

        : Sessions
    /     : Talks
        : Breaks
8 Dec 2014
9 Dec 2014
10 Dec 2014
AM
08:15 Executive Session   (61-1-017 (Room D))
09:00 Welcome and introduction - Prof. Lucio Rossi (CERN)   (40-S2-D01)
Slides
09:10 The collimation project - 15' + 5' - Dr Stefano Redaelli (CERN)   (40-S2-D01)
Slides
09:30 Overview of the 11T dipole project - 20' +10' - Dr Frederic Savary (CERN)   (40-S2-D01)
10:00 --- Coffee break ---
10:15 Beam specifications - 15' + 10' - Dr Massimo Giovannozzi (CERN)   (40-S2-D01)
Slides
10:40 Electromagnetic design - 20' + 10' - Dr Susana Izquierdo Bermudez (CERN)   (40-S2-D01)
Slides
11:10 Mechanical design - 20' + 10' - Dr Friedrich Lackner (CERN)   (40-S2-D01)
Slides
11:40 Quench protection - 20' + 10' - Dr Susana Izquierdo Bermudez (CERN)   (40-S2-D01)
Slides
08:15 Executive Session   (30/6-041)
09:00 Analysis of the production data from CERN – Part 1 - 20' + 10' - Mr David Smekens (CERN)   (112-R-028)
Slides
09:30 Analysis of the production data from CERN – Part 2 - 20' + 10' - Mr Christian Hannes Loffler (CERN)   (112-R-028)
Slides
10:00 --- Coffee break ---
10:30 Design features of FNAL 11T dipole models and analysis of the production data from FNAL - 30' + 10' - Dr Alfred Nobrega (Fermi National Accelerator Lab. (US))   (112/R-028)
Slides
11:10 Visit of the large magnet laboratory in B180   (Building 180)
08:15 Executive Session   (60/5-012)
09:00 Additional presentations as needed, or specific sessions upon request of the review committee   (60/5-012)
10:30 --- Coffee break ---
10:45 Executive Session   (60/5-012)
11:30 Close-out   (40-S2-A01)
Slides
PM
12:10 --- Lunch break ---
13:30 Executive Session   (61-1-017 (Room D))
14:00 11T cable development and procurement strategy at CERN - 20' + 10' - Dr Bernardo Bordini (CERN)   (40-S2-D01)
Slides
14:30 Design of the cryo-assembly - 20' + 10' - Dr Delio Duarte Ramos (CERN)   (40-S2-D01)
Slides
15:00 Design of the 6 m cold mass assembly - 20' + 10' - Dr Herve Prin (CERN)   (40-S2-D01)
Slides
15:30 --- Coffee break ---
16:00 11T dipole electrical circuit - 15' + 10' - Dr Ludovic Grand-Clement (CERN)   (40-S2-D01)
Slides
16:25 Powering = 15' + 10' - Dr Hugues Thiesen (CERN)   (40-S2-D01)
Slides
16:50 ELQA and protection in the machine - 15' + 10' - Dr Arjan Verweij (CERN)   (40-S2-D01)
Slides
17:15 Executive Session   (40-S2-D01)
19:30 --- Review Dinner ---
12:10 --- Lunch break ---
13:10 Visit of the magnet facility in B927   (Building 927)
14:00 Powering tests results - 20' + 10' - Dr Gerard Willering (CERN)   (864-1-D02)
Slides
14:30 Magnetic measurements and analysis at CERN - 20' + 10' - Dr Lucio Fiscarelli (CERN) Dr Olaf Dunkel (CERN)   (864-1-D02)
Slides
15:00 Summary of tests results at FNAL - 30' + 10' - Dr Alexander Zlobin (Fermilab)   (864-1-D02)
15:40 --- Coffee break ---
16:00 Project plan & production strategy - 20' + 10' - Dr Frederic Savary (CERN)   (864-1-D02)
16:30 From winding to impregnation - 15' + 10' - Dr Raul Moron-Ballester (CERN)   (864-1-D02)
Slides
16:55 From collaring to cold mass finishing - 15' + 10' - Mr Christian Hannes Loffler (CERN)   (864-1-D02)
Slides
17:20 Executive Session   (61-1-007 (Room B))