4–8 Aug 2015
America/Detroit timezone

Performance of the CMS endcap muon detector in Run 2

5 Aug 2015, 16:46
23m
Room D (Michigan League)

Room D

Michigan League

LHC Run-2 Detector Performance LHC Run-2 Detector Performance

Speaker

Wells Wulsin (Ohio State University (US))

Description

Since the end of LHC Run 1 in 2012, the readout electronics of the innermost ring of the CMS Cathode Strip Chambers (CSC) endcap muon detector have been upgraded to accommodate the larger luminosity and collision energy anticipated in Run 2. A major effort was required to design, install, and commission these new electronics. This talk will summarize the improvements made during this upgrade and present the performance of the CSC detector during the early stages of Run 2.
Oral or Poster Presentation Oral

Primary author

Wells Wulsin (Ohio State University (US))

Presentation materials