apologies: F. Duarte Ramos, A. Gaddi, L. Linssen
direct link to webex
webex info

Concerning the "long L*"

-> Daniel Schulte stresses that this is being studied for lower energies, but that an answer for 3 TeV is still a long way away

-> Daniel also raises the question whether one could consider a modification of the experiment in a long shut-down, going from a "long L*" to a "short L*" ... typically, shutdowns between energy stages of CLIC will be of order 2 years

-> there were no serious concerns about the reduced number of layers in the muon system

-> there were no other objections to a working hypothesis of a long L* = 6 metres

-> the end-coil design might be modified for lower power consumption if the field on-axis is the only concern, rather than limits on the stray magnetic field

There are minutes attached to this event. Show them.
    • 10:00 → 10:20
      Towards a final value for a " long L* " at CLIC 20m
      Speaker: Konrad Elsener (CERN)
      Slides - updated 23 Feb 2015
    • 10:20 → 10:40
      Update on HCAL forward coverage 20m
      Speaker: Nikiforos Nikiforou (CERN)
      Slides
    • 10:40 → 11:00
      Parameters of the new detector model / tables in Twiki 20m
      Speaker: Marko Petric (CERN)
      Slides
    • 11:00 → 11:20
      Follow-up on HCAL simulations 20m
      Speaker: Steven Green (University of Cambridge (GB))
      Slides
    • 11:20 → 11:25
      A.O.B. and next meeting 5m