EUDET/LCTPC electronics meeting

Thursday 21 August 2008 - 16:00
CERN (4/1-021)

        : Sessions
    /     : Talks
        : Breaks
21 Aug 2008
AM
PM
16:00 Status of the remaining 800 PCA16 preamp chips (pupose: produce a time schedule)  
16:05 Status of mounting the 40 MHz ALTRO's onto the FEC  
16:15 Test results of the first 200 PCA16 preamp chips (purpose: decide on performance limits for acceptance)  
16:25 Results of the FEC system tests (version 2) (purpose: decide whether reference voltages of ALTRO fixed/variable)  
more information
Slides
16:35 Status of readout units (RCU, SIU, DCS and DRORC) and of firmware needed for >10MHz readout  
16:45 Status of the distributor box, integration with beam trigger, and distribution of 40 MHz clock to RCU's  
Slides
16:55 Mechanics and first impressions from cooling tests  
Slides