16:00
|
Status of the remaining 800 PCA16 preamp chips (pupose: produce a time schedule)
|
|
16:05
|
Status of mounting the 40 MHz ALTRO's onto the FEC
|
|
16:15
|
Test results of the first 200 PCA16 preamp chips (purpose: decide on performance limits for acceptance)
|
|
16:25
|
Results of the FEC system tests (version 2) (purpose: decide whether reference voltages of ALTRO fixed/variable)
|
|
16:35
|
Status of readout units (RCU, SIU, DCS and DRORC) and of firmware needed for >10MHz readout
|
|
16:45
|
Status of the distributor box, integration with beam trigger, and distribution of 40 MHz clock to RCU's
|
|
16:55
|
Mechanics and first impressions from cooling tests
|