Grid-Operator-on-Duty handover 5m
- From Rusia (backup: CE) to CERN (backup: SE)
- 16:10
-
16:25
Issues to discuss 25m
Reports were not received from: IN2P3-CC, NDGF, BNL, FNAL, KNU, ATLAS, CMS, LHCb, BioMed- PPS has started to install gLite 3.0.0 RC5
- Solution for double publishing of resources.
- Some ATLAS users submited jobs to a site while it was in Scheduled Downtime. Is it a software bug in RB or the users software? (CE)
- LHCB doesn't respect the GlueCEPolicyMaxTotalJobs limit. Therefore the CGG-LCG2 can't work correctly. 3 reboots of the CE were needed because of the overload caused by LHCB and BIOMED. (FR)
- LAL succeeded in setting up LCG WN M/W with SL 4.2. (FR)
- INFN would be interested in knowing the tools in use in other non-INFN sites for accounting of disk space utilization. (IT)
- BLAHParserPBS server runs as root and does not contain any form of authentication. It exposes the pbs logs to the outside world. (NE)
- Proper init.d script was not provided so had to write our own that would properly daemonise it. (NE)
- SFT test jobs regularly submit themselves to 10min site queue but run for longer than 10 minutes and terminate prematurely, registering as a permenant error (even if all of the tests passed!). This is not the first time this has been raised but no response from the SFT developers. (UK/I)
- SFT RM tests having intermittent problems with non-local services (due to missing/invalid credentials) registering as a local site failure. Also happening last week and resulted in CIC tickets. No response has been received from the SFT developers. See also GGUS ticket #8636 (UK/I)
- Is the link https://lcg-sft.cern.ch/sft/metrics.html still correct for the metric reports for the ROCs?
-
16:50
Status update on deployment of gLite 3.0.0 at Tier 1 sites 15m
-
17:05
Upcoming SC4 Activities 10mSee attached documents for proposal for establishing T0-T1 transfers as full production services, and for data rates by T1 site for ATLAS T0-T1 export tests from June 19 - July 7.
Reminder of WLCG Tier2 workshop and tutorials at CERN June 12-16.
Please register (for both / either events seperately) if you plan to attend.