- Matteo Solfaroli Camillocci
- Laurette Ponce
Salvatore Danzeca
15/12/2015, 12:20
R2E and the Mitigation Strategy
Radiation levels and comparison with previous run
Failure analysis and strategy (Information collection, QPS, EPC, RF, Others, Summary and prevision, TID: long term problem)
On-going and future developments (radiation tolerant requirements)
Olivier Brunner
(CERN)
15/12/2015, 12:40
The LHC beam intensity increase not only required the system to routinely run close to its maximum performances, but also demanded a very high operational reliability from the entire system. This talk will describe the operation of the LHC RF system during 2015, including new features, operational procedures and the lessons learned.