Tragkraft (orange) table for ECAL

First installations at 0 mrad, then put an an angle depending on the beam energy.

Main program Calibration of HCal (1-2 days) using muon beam

Provide at least 1.5 meter between vacuum and HC

Make sure that the vacuum is fitting in between MBPL and EC

Send layout of chambers upstream MBPL and upstream of ECAL.

Verify that beam window 150 to 273 is upfront of third micromega chamber.