25–28 Jan 2016
Chamonix - Les Aiglons
Europe/Zurich timezone

Challenges for the SPS and SPS-to-LHC transfer for the 2016 Run 1

25 Jan 2016, 18:35
25m
Chamonix - Les Aiglons

Chamonix - Les Aiglons

Session 2: Key Challenges for Operation Session 2: Key Challenges for Operation

Speaker

Verena Kain

Description

20’ + 5’

The LHC 2016 run will be a high intensity 25 ns physics production run. During the 2015 commissioning run several issues for the SPS and SPS-to-LHC transfer became apparent which will need to be addressed in 2016 and the years to come. Some of these will only be fully mitigated with the LIU upgrade of the SPS. This talk will summarize the experience with 25 ns beams in the SPS during 2015 run and present the achieved performance. Outstanding issues such as orbit control at flattop, satellite population, tail population etc. as well as mitigation possibilities for the next run will be discussed.

Presentation materials