The items to be reviewed are:
1. The VELO and UT evaporator concept and performance
– Validate experimentally the assumptions made in the requirements document
– Review the suggested evaporator and manifold design
– Review the conceptual design of the connection to the junction box
2. The LUCASZ cooling plant for UT assembling and commissioning
– The design parameters and the conceptual design of this much smaller plant,
which is a common development with CMS, will be reviewed as well.
3. The cooling plant conceptual design
– The Process & Instrumentation design document should be reviewed,
and a very basic Functional Analysis done
– Review of schedule and cost estimate for cooling plant
– Have the WP between LHCb and DT for plant construction ready
4. The transfer line concept
– Finalize the locations for cooling plant and junction box in close
collaboration with the Technical Coordination team