LIU - Planning & Installation meeting
Thursday 10 December 2015 -
15:00
Monday 7 December 2015
Tuesday 8 December 2015
Wednesday 9 December 2015
Thursday 10 December 2015
15:00
Approval of the minutes
-
Julie Coupard
(
CERN
)
Approval of the minutes
Julie Coupard
(
CERN
)
15:00 - 15:05
Room: 874/R-018 - salle de réunion activité CCC
15:05
Follow-up on the ECRs
-
Julie Coupard
(
CERN
)
Follow-up on the ECRs
Julie Coupard
(
CERN
)
15:05 - 15:15
Room: 874/R-018 - salle de réunion activité CCC
15:15
LIU-PS ECR PS-ACC10-EC-0001 (EDMS 1563704) Upgrade of the RF Amplifier and Installation of a New Water Distribution for the 10MHz Cavity in SS11 of the PS Ring
-
Carlo Rossi
(
CERN
)
Valentin Daniel Desquiens
(
CERN
)
Heiko Damerau
(
CERN
)
LIU-PS ECR PS-ACC10-EC-0001 (EDMS 1563704) Upgrade of the RF Amplifier and Installation of a New Water Distribution for the 10MHz Cavity in SS11 of the PS Ring
Carlo Rossi
(
CERN
)
Valentin Daniel Desquiens
(
CERN
)
Heiko Damerau
(
CERN
)
15:15 - 15:30
Room: 874/R-018 - salle de réunion activité CCC
Installation of a new water distribution in SS11 for the renovated final amplifier of the 10MHz cavity
15:30
LIU-SPS ECR SPS-V-EC-0002 (EDMS 1543081) Modification of the SPS sectorization in long vacuum sector 460
-
Jose Antonio Ferreira Somoza
(
CERN
)
Chiara Pasquino
(
CERN
)
LIU-SPS ECR SPS-V-EC-0002 (EDMS 1543081) Modification of the SPS sectorization in long vacuum sector 460
Jose Antonio Ferreira Somoza
(
CERN
)
Chiara Pasquino
(
CERN
)
15:30 - 15:45
Room: 874/R-018 - salle de réunion activité CCC
Installation of 1 new DN 100 sector valve (VVSA). A new gauge (Pirani and Penning) have also to be installed. Two new VVR (roughing valves) have to be installed. This is the first step of a larger sectorization campaign that will involve the remaining arcs, starting from EYETS.
15:45
LIU-PSB ECR PSB-MSMIB-EC-0001 (EDMS 1561343) Upgraded PSB Vertical Distribution Septum BI.SMV10
-
Michael Hourican
(
CERN
)
LIU-PSB ECR PSB-MSMIB-EC-0001 (EDMS 1561343) Upgraded PSB Vertical Distribution Septum BI.SMV10
Michael Hourican
(
CERN
)
15:45 - 16:00
Room: 874/R-018 - salle de réunion activité CCC
Removal of the current BI.SMV10 and installation of a new 160 MeV BI.SMV10 with associated transformers and connections
16:00
LIU-PSB ECR PSB-K-EC-0001 (EDMS 1560692) BSW Chicane Stripping Foil Magnet Power Converter Infrastructure
-
David Hay
(
CERN
)
LIU-PSB ECR PSB-K-EC-0001 (EDMS 1560692) BSW Chicane Stripping Foil Magnet Power Converter Infrastructure
David Hay
(
CERN
)
16:00 - 16:15
Room: 874/R-018 - salle de réunion activité CCC
For the 160 MeV beam injection into the Proton Synchrotron Booster (PSB), a new H- charge-exchange injection system will be installed in sector 1L1, as described in ECR: PSB-L-EC-0001. With reference to document 1495860, sixteen new BSW chicane stripping foil magnets, 4 in each ring, will be installed in 1L1 necessitating the installation of 60 new standard 19¿ racks to house the power converters, auxiliary power infrastructure and the magnet interlocks. The pulse transformers for BSW2, 3, and 4 shall be separated from the power converters and installed at a separate location.
16:15
AoB
AoB
16:15 - 16:20
Room: 874/R-018 - salle de réunion activité CCC