Site is running well
Illinois is currently down for a PM
FY16 Purchases (~49K HS06 via 4224 logical cores, 5.25PB dCache disk)
- UChicago
- Compute Nodes - 48 R630 nodes
- E5-2640 v4 (10/20 cores), 40 Logical Cores/node
- 1920 Logical Cores @ ~11.57HS06/lc = ~22.2K HS06
- 128GB/node (3.2GB/LC)
- 2x800GB SDD drives (~30GB/LC)
- Storage Servers - 7 R730/xd nodes
- E5-2680 v4 (14/28 cores), 56 Logical Cores/nodes
- 256GB/node
- 2x500GB SAS drive for system
- Storage systems - 7 x (3460 + 3060e)
- 840 x 8TB drives
- About 5.25PB usable space
- MWT2 dCache ~9PB
- Other R730/R630 for hypervisor, perfSonar, analytics and dCache name server nodes
- Juniper switch and blades need to be ordered
- 10Gb and 40Gb blades for Juniper 9208
- Storage servers at 4x10Gb
- Top of rack at 2x10Gb and 40Gb
- Juniper 3400 top of rack for 1Gb nodes
- Juniper 4550 top of rack for 10Gb nodes (R630)
- Indiana
- Compute Nodes - 24 R630 nodes
- E5-2640 v4 (10/20 cores), 40 Logical Cores/node
- 960 Logical Cores @ ~11.57HS06/lc = ~11.1K HS06
- 128GB/node (3.2GB/LC)
- 2x800GB SDD drives (~30GB/LC)
- Illinois
- Nodes must conform to Illinois Campus Cluster configuration and pricing
- Dell confirmed the order
- Network switches ordered (Juniper QFX5200)
- Electricians are no available due to summer projects on campus
- Racks and installation will be delayed until fall
- Nodes should be delivered and online by end of the month
- 6 x C6320 chassis (4 nodes per chassis, 24 two socket nodes)
- E5-2680 v4 (56 logical cores/node with HT enabled)
- 11.57 HS06/LC
- 1344 Logical Cores
- Adds 15,550 HS06
- 256GB (4.5GB/LC)
- 10Gb to each node
Site updates
- OSG 3.3.14
- Condor 8.4.8
- CVMFS 2.2.3