Present: Luigi Scibile (Group Leader SMB-SE), Luz Anastasia Lopez Hernandez (Section Leader SMB-SE-PO), Michele Battistin (Section Leader EN-CV-PJ), Nuno Dos Santos (representing EN-EL-ENP), Alick Macpherson (representing BE-RF-SRF), Ghislain Roy (BE space manager), Frank Gerigk (BE-RF, CERN SRF Coordination)

The goal is to start with a feasibility study of the proposed SM18 extension and to move towards the construction phase as soon as possible. Parts of the extension have to be ready for use Q4/2017. The most urgent part is to define the outline of the building and to clarify whether the 2 air inlets for CV, can be moved onto the roof of the building or displaced and at which cost. The following actions are needed: 

Actions: 

  1. F. Gerigk to contact EN-HE for a link person and someone to define how far the building can be extended without disturbing the truck traffic along this side of SM18. After the meeting: Damien Lafarge has agreed to look into this question and to provide an answer for the beginning of August. 
  2. EN-CV (M. Battistin & Alexandre Broche) to study if the air inlets can be displaced (e.g. onto the roof) and at which cost.  
  3. EN-CV to study if the HIE-ISOLDE clean room can be cooled in its present location. If not an air conditioning system shall be considered for the assembly area in the extension, so that the HIE-ISOLDE clean room can be moved there in the future. 
  4. SMB-SE to define a link person which can follow the project.
  5. F. Gerigk to set up a weekly project meeting. 
  6. Add the project to PLAN (K. Schirm).

 

Decisions: 

 

Discussion items: 

Minutes by F. Gerigk