18–22 Jun 2017
Hilton Brighton Metropole Hotel
Europe/London timezone

Correlating Cygnus Diagnostics to Machine Reliability

19 Jun 2017, 13:30
1h 30m
Hall 4 / Cambridge (Hilton Brighton Metropole Hotel)

Hall 4 / Cambridge

Hilton Brighton Metropole Hotel

Board: 47
Poster Pulsed Power Physics and Technology, Components and HV Insulation Poster session I - Pulsed Power Physics and Technology, Components and HV Insulation

Speaker

Bernard Meehan (NSTec)

Description

The Dual Beam Radiographic Facility (aka Cygnus) has been operating successfully for over 10 years providing invaluable data for our nation’s stockpile mission. However successful, there have been some failures that may have been predicted, hence eradicated, during an uninterrupted operation phase. This report describes a statistical method to incorporate existing machine diagnostics, such as B-dots and D-dots, located at various positions throughout the pulsed power delivery chain to predict degraded performance and expose dormant failure modes. A basic graphical user interface (GUI) tool, which performs and displays the statistical computations and results, will also be described herein. The ability to leverage machine diagnostics, statistical inference, and historic data will prove invaluable to Cygnus operation and provide a foundation for predictive maintenance for other pulsed power facilities.

*This work was done by National Security Technologies, LLC, under
Contract No. DE-AC52-06NA25946 with the U.S. Department of
Energy.

Primary authors

Presentation materials

There are no materials yet.