HL-LHC integration meeting n82: Discussion on the exit to warm temperature of the CLIQ, instrumentations and TRIM leads for the Q1 to DFX assembly
Friday 18 Aug 2017, 10:30
→
12:30
Europe/Zurich
376/1-020 (CERN)
376/1-020
CERN
16
Show room on map
Paolo Fessia
(
CERN
)
EDMS of the event
10:30
→
10:45
List of instrumentation and other wires to be taken out from each Cold Mass from Q1 to D1 included
15m
Speaker
:
Paolo Ferracin
(
CERN
)
2017_08_18_Integration-meeting_instrum.pdf
2017_08_18_Integration-meeting_instrum.pptx
10:45
→
11:05
List of options to bring those wires to the warm side (including cryo instrumentation and other wires for cryostats i.e. alignment ? )
20m
Speakers
:
Delio Duarte Ramos
(
CERN
)
,
Herve Prin
(
CERN
)
Q1-D1_Cryostat_Integration meeting Aug2017.pdf
Q1-D1_Cryostat_Integration meeting Aug2017.pptx
11:05
→
11:20
Considerations from machine protection and the ELQA teams
15m
Speakers
:
Daniel Wollmann
(
CERN
)
,
Felix Rodriguez Mateos
(
CERN
)
,
Mateusz Jakub Bednarek
(
CERN
)
New_IT_magnets-cable_routing.pdf
New_IT_magnets-cable_routing.pptx
11:20
→
11:40
RP recall around the area
20m
Speaker
:
Cristina Adorisio
(
CERN
)
Residual Dose Rate Estimations in the LSS1 and LSS5
11:40
→
11:50
R2E considerations on connectors and other equipment
10m
Speaker
:
Ruben Garcia Alia
(
CERN
)
2017-08_WP15_DFX.pdf
11:50
→
12:05
Recall on the physical environment around, access and where we need to bring the cables
15m
Speaker
:
Maria Amparo Gonzalez De La Aleja Cabana
(
Universidad Politecnica de Madrid (ES)
)
12:05
→
12:30
Discussion
25m