Fernanda send us a presentation done on the 17 of January which explain what they foresee on the PAD marking.
On the page 18 of the presentation, we can see that the marking of the foot print is done.
On the page 20 to 22, they foresee to do some support islands either in epoxy or cement-based for the 20 feet with a flatness adjusted to +/- 1mm. (At least 7 days of curing)
The total eight of the support islands will be between 4,25" and 5,25" (10,2cm and 12,7cm).
Did you take into account the total height of the warm vessel with the concrete roof?
Some test are foreseen to make sure that the G10 electrical isolation of 0,125" will accept the weight of about 50 Tonnes on each PAD.
We have 2 cranes of 30T each but they can't work together with the same remote.
Can we have the minimum length between the 2 hooks of the 2 cranes?