Exchange of thoughts on the pipework (i.e. dimensions if pipes being fed to the tank, insulation and pressure specifications) between the junction box and the VELO vacuum tank.
What connectors will be on the pipes at the VELO tank? What are the requirements for stress relief/mounting points needed etc.?