Discussion After Talk
- ?Consensus (?) for the option to keep the readout for new detectors similar to existing detectors
- The TOF is probably where the readout will diverge most
- ?We have experience in adding the INGRID TOF, which has more demanding requirements than ND280 Upgrade TOF
- Will expect some firmware re-writing for timing issues anyway
- ?The ability to simulate large numbers of POT is already being stretched
- ?Need to put effort into reducing file sizes and simulation times
- ?Low-hanging fruit already culled
- ?The collaboration needs to assign analysis effort to size and time reduction
- Even more so with new detectors coming