New 1.5PB storage in production.
WAN and MGHPCC networking upgrade underway: 100G to NoX/LHCONE and multi 40G to NESE fabric. Equipment is partly here. We are involved of a re-design of the networking on the MGHPCC floor. Networking from the Northeastern University Pods to NET2 has been improved so that we can ramp up Mass Open Cloud production.
There were 5000 transferring jobs from HU_ATLAS_Tier2 this morning. High but seems to be gradually going down. We're watching the situation.
We have smooth operations and full sites otherwise.