BI/TB on HST/LN4 performance assessment, LHC status and OAF
→
Europe/Zurich
HST (Greta):
- BTV: charging of BTV screen – effect of Ag coating to be checked (BI-PM)
- BCT: accuracy of current measurement to be verified during reliability run (BI-PI)
- BLM: VFC/DI acquisition system requested for LN4/PSB connecting (LIU-PSB with BI-BL)
- BPM: minimum beam pulse length for reliable position measurement to be assessed (BI-PI)
- BWS: offset values to be provided
LN4 (Alessandra):
- BCT: Operational application for intensity traces (OP-PSB / PI / SW)
- BLM: Operational application available ? (OP-PSB / BL / SW)
- BSM: Make system less reliant on expert presence (OP / EA / SW)
- BSG: Publish functional specifications for MEBT grids (ABP / RF / OP with PM/ML)
- BPM: Clarify requirements for additional detectors on MEBT
- BLM: Clarify locations for LN4/PSB connection (ABP/OP with BL)
LHC (Enrico):
- Lifetime: investigate ways to provide values for low-intensity beams (JJ Gras)
- BWS: make systems operational (PM / SW)
- DOROS: investigate non-linearity issues and find cure (QP / SW)
- BPM: find cure for glitches (QP / SW)
- BRAN : find cure for system instabilities (PM / SW)
- BCTF: find cure for system instabilities (PI / SW)
- BSRT: gain control and calibration (PM / SW)