BI/TB on SBDS, AD for BI and protoDUNE

Europe/Zurich
866/2-D05 (CERN)

866/2-D05

CERN

30
Show room on map

EN-STI:

  • 0.5 mm position resolution requested
  • Determine damage level for Chromox screens (titanium should be ok)
  • Radiation levels for BTV camera to be estimated (shielding?)
  • Determine energy deposition on SEM fingers
  • Need decisions before starting mechanics design

BI@AD:

  • Main problem related to tune measurement (OP/BI)
  • E-cooler upgrade on-going (LS2)
  • BCCCA normalisation issue now resolved?

Proto-Dune:

  • Tests
    • Principle Sep-2017 EHN1
    • Beam Oct/Nov 2017 East area
There are minutes attached to this event. Show them.