D2 Short model Cryogenic test interface meeting #01
Wednesday 7 Jun 2017, 09:00
→
12:10
Europe/Zurich
B2173 (SM18) (CERN)
B2173 (SM18)
CERN
Minutes D2 Short model Cryogenic test interface meeting.docx
Minutes D2 Short model Cryogenic test interface meeting.pdf
09:00
→
09:10
Introduction (CERN)
10m
D2_Cold_test interface A Foussat[1].pdf
D2_Cold_test interface A Foussat[1].pptx
09:10
→
09:30
Presentation of D2 short model ( layout, dimensions, interfaces, cables, structure design) (INFN)
20m
D2 Short model Cryogenic test interface meeting #01.pdf
D2 Short model Cryogenic test interface meeting #01.pptx
09:30
→
09:50
Magnetic measurement requirements, (INFN) discussion on hardware adaptation, actions (CERN)
20m
LFiscarelli_MM_on_D2_b.pdf
LFiscarelli_MM_on_D2_b.pptx
09:50
→
10:05
Presentation of vertical test cryostat, main interfaces, common mechanical adaptation, (CERN TF)
15m
H_BAJAS_D2_07062017.pdf
H_BAJAS_D2_07062017.pptx
10:05
→
10:20
Instrumentation table by INFN, discussions (all)
15m
Draft D2-instrumentation per INFN proposal June 2017.xlsx
10:20
→
10:40
Discussion on DAQ instrumentation interface : connectors types (QHs, VTs, SG, TS) , leads lengths, number of channels (CERN TF, EN-MME M Guinchard)
20m
INFN_D2_short Model_mechanical instrumentation.pdf
INFN_D2_short Model_mechanical instrumentation.ppt
10:40
→
10:50
Optical strain fiber experience on MQX, discussion coil OF sensing proposal ( A. Chiuchiolo)
10m
Magnets and Facility instrumentation with FOS.pdf
Magnets and Facility instrumentation with FOS.pptx
10:50
→
11:10
Discussion on interface preparation of coils, cryostat ( structure preload, splices on leads, Cryostat interface flange, …) (INFN, CERN)
20m
11:10
→
11:25
QA Hi-Voltage test before transport ( INFN) , at reception and after CD test (CERN)
15m
11:25
→
11:40
Quench protection test interface, Common Test scenario plan proposal (CERN, MSC TF,LMF), discussion all.
15m
DRAFT TO be completed by INFN CERN_D2 dipole short model_standard_test_procedure.docx
DRAFT TO be completed by INFN CERN_D2 dipole short model_standard_test_procedure.pdf
11:40
→
11:50
Overall updated SM coil Schedule (INFN)
10m
11:50
→
11:55
AOB
5m