Conveners
Facility Updating
- Walter Wuensch (CERN)
Description
Lecture Hall
We have been tested many CLIC prototype TW structures in Nextef-A.
We will review recent ones, TD24R05 and TD26CC-K1.
Also we have started the single-cell SW tests in Nextef-B.
We briefly discuss what we have done and what is being done.
In both test stands, we will discuss what we will chase in near future.
Much has been learned in the past decade regarding high gradient RF structures, in particular, thanks to the operation of the European X-band test facilities at CERN. The CLIC study needs to present to the European Strategy Group a case for a 380 GeV machine upgradable to higher energies and with a final aim of 3TeV centre of mass collisions. This case needs to address, design,...
The Argonne Wakefield Accelerator (AWA) facility is transforming into a dual function facility which is continuously working on its main mission of developing the dielectric structure based short pulse Two Beam Acceleration (TBA) technology while providing the full access of flexible multiple beamlines to users. In this talk, we report on the recent dielectric TBA experiments and the new...