Participants: Fanouria Antoniou, Thomas William Birtwistle, Jean-Baptiste Bonnamy, Jan Borburgh, Chiara Bracco, Dario Carloni, Paul Richard Demarest, Ilias Efthymiopoulos, Vincenzo Forte, Eve Fortescue-Beck, Georgi Minchev Georgiev, Greta Guidoboni, Matthias Haase, Klaus Hanke, Christoph Hessler, Bettina Mikulec, Antony Newborough, Gabor Petrika, Carlo Petrone, Serge Pittet, Theo Prins, Benoit Riffaud, Andrea Santamaria Garcia, Jocelyn Tan, Thomas Zickler.

Approval of minutes

The minutes of the LIU-PSB WG #203 were approved.

Communications

Report on the LIU Project meeting of the 2nd of November 2017.

Report on meeting with STI:

Report on meeting with BE space manager:

Follow-up on open actions

T. Dobers (2017-10-24): Change the value of the wide band pick-up in Geode to the one given by the 3D scan.

T. Dobers (2017-10-31): Make a list of starting points of the transfer lines to be sent for approval in an EDMS document.

C. Hessler (2017-11-07): Send the new MAD-X file to I. Efthymiopoulos and T. Birtwistle for the upgrade of the LIU-PSB and current MAD-X optics, and the layout database.

K. Hanke (2017-10-24): Find space to store the material for the Finemet cavities installation. In progress

G. Petrika (2017-10-31): Iterate with integration on the installation of the new piping system for cooling.

Support girders for equipment in the BTP (Benoit Riffaud)

The set-up will consist of individual supports and girders which can serve for several components, each of them individually adjustable. It needs to be decided for  which equipment individual supports are needed, and which components can be mounted on common girders.

Comments

PS Complex Layout Database Refurbishment and Post-LS2 Version (Thomas Birtwistle)

Comments

Injector Optics Repository - Status Update (Ilias Efthymiopoulos)

Comments

AOB

Tour de table

Nothing to report.

Next LIU-PSB meeting: 21th of November on the B-train measurements (Marco Buzio).