Notes from Technical Meeting

 

Discussion on GPUs in Dirac (see slides)

The plan is to have something  basic in place before Christmas and gain experience rather than designing something all singing all dancing at the beginning that people may not use. For structure see the talk.

T2 Evolution

Jobs 

Manchester has been running LHCb VMs to backfill behind Atlas multicore jobs

Singularity and Atlas: Alessandra has managed to get singularity working on very different systems at Manchester and Glasgow and is looking for other site to try this (Imperial fits).

Storage

There has been work on Atlas and xrootd cache especially at Lancaster ECDF. There has been discussion with Chris Brew because of his CMS experience.

Security

There is a security operations centre meeting this afternoon and there is preparation for the December.

There will be discussions at the pre-GDB about authorisation next week and how it evolves in the next years. There seems to be a consensus see:

https://indico.cern.ch/event/578992/contributions/2766132/attachments/1554830/2444681/20171107-pre-GDB-AuthZ-Summary.pdf 

X.509 is not for everybody.

AoB

The next annual RCUK Cloud meeting will be in January. The registration page is at:

 

https://www.eventbrite.co.uk/e/research-councils-uk-cloud-workshop-tickets-39439492584