Participants: Simon Albright, Fanouria Antoniou, Thomas William Birtwistle, Fulvio Boattini, Jean-Baptiste Bonnamy, Dario Carloni, Julie Coupard, James Dilwyn Devine, Jose Antonio Ferreira Somoza, Eve Fortescue-Beck, Robert Froeschl, Georgi Minchev Georgiev, Matthias Haase, Antony Newborough, Gabor Petrika, Serge Pittet, Jerôme Rodary, Andrea Santamaria Garcia, Lars Soby.

Approval of minutes

The minutes of the LIU-PSB WG #207 were approved.

Communications

Follow-up of open actions

M. Buzio (2018-02-06): Provide document describing the specifications of the B-Train system.

T. Dobers (2018-02-06): Produce the tilt measurement tool and perform measurements on spare / future magnets.

G. Petrika (2018-02-06): Specify the steps to be taken during the removal of the heaters during the YETS.

G. P. Di.Giovanni (2018-02-06): Find space to store the materials for the finement cavities installation.

Status of the installation of the POPS-B converters in B25 (Fulvio Boattini)

AOB

Summary of the removal of the heating units in the BTM (Gabor Petrika)

Comments

Tour de Table

Next LIU-PSB meeting: 20th of February on the MD planning and priorities for 2018 by F. Antoniou and S. Albright.