Participants: Simon Albright, Maria-Elena Angoletta, Thomas William Birtwistle, Jean-Baptiste Bonnamy, Dario Carloni, Julie Coupard, Gian Piero Di Giovanni, Alessandro Floriduz, Vincenzo Forte, Robert Froeschl, Matthias Haase, Christoph Hessler, Bettina Mikulec, Antony Newborough, Adrian Oeftiger, Serge Pittet, Sylvie Prodon, Jerôme Rodary, Andrea Santamaria Garcia, Frank Schmidt.

Approval of minutes

The minutes of the LIU-PSB WG #208 were approved.

Communications

LIU-PT meetings

Cost and schedule review

LIU Beam Performance Meeting

Follow-up of open actions

T. Dobers (2018-02-06): Produce the tilt measurement tool and perform measurements on spare / future magnets.

M.Calviani/I.Lamas (2018-02-15): Prepare the ECR for the PSB scraper/absorber describing both the dismantling of the current equipment and the installation of the new one.

I. Efthymiopoulos (2018-02-20): Make a list of starting points of the transfer lines to be sent for approval in an EDMS document.

MD planning and priorities for 2018 (Fanouria Antoniou and Simon Albright)

The allocation of MD blocks for 2018 was presented by topic, here we report only the highest priority MD:

Injection (14 MD blocks)

Longitudinal (69 MD blocks)

Transverse (>90 MD blocks)

Extraction (>8 MD blocks)

Comments

AOB

Follow-up on the Installation Readiness for LS2 (Julie Coupard)

Comments

Follow-up on the ECR for LS2 (Thomas William Birtwistle)

The following ECRs are still missing:

Comments

EVM PSB Update (Sylvie Prodon)

 Comments

Next LIU-PSB meeting: 6th of March on the intervention scenarios and spare policy of the transformers by Davide Aguglia.