CRU Weekly meeting (13 Dec 2017)
Present: Joel, Tuan, mazsi, PiPPo (joining later)
Secretary: Erno(23), PiPPo(9), Shuaib(1), mazsi(37)
Report on Actions:
N/A
Actions:
N/A
1. 10G PON
- discussions with CTP people on data format for flow control messages
2. GBT
- erno is working on the fPLL based clocking solution
- erno is working on support for 48 links
3. DCS
- pippo: working on IC, tested in hw.
- mazsi: first implementation of Single Word Transactions + USer Messages
4. PCIe
- internal discussion about data endianness within CRU - we should probably everywher send little endian part first. will probably implement it only after next release.
5. Integration
- tuan working on flow control reporting block
- tuan working on adding error/exception reporting to avalon_mm_slave_vererr
- we have now support for multiple user logics in the design - pippo is converting DDG to user logic
- TPC user logic: not ready yet, integration stalled
- mazsi: plan to have internal release this week, as a preparation to the public release next year
6. Production:
N/A
7. Simulation
N/A
AOB
- grenoble people managed to compile the FW - 15h compilation time
Travels/Vacations
- Dec 15 - XX: pippo @ ITS workshop
- Dec 11 - 13 - visit to India (Tivadar, Barnafoldi, Tapan, Alex, Federico)
- dec 19: Mazsi leaves cern
- dec 20: tuan leaves cern
There are minutes attached to this event.
Show them.