Present
Joël, Mazsi, Olivier, Pippo, Erno,
10G PON
(Mazsi)
- TODO : fix the Qsys IPs
- Test will continue with trigger team, that is test with the developpement kit, and then a test with CRU for next week
- Will rebase later on in the new "stitched" git.
GBT
(Erno)
- Changes were implemented for the new git (library names and components)
- Documentation is in progress
- => Be aware, to use the new repository or changes will be lost
DCS
(Pippo)
- An issue has to be solved.
- SCA is working
- IC is not working anymore, it has to be fixed (needed only by one detector)
- Request from MFT to have a firmware using several SCA chips. Every link configures 5 chips.
- Integrate this a a dedicated firmware or for all.
- A prototype has to be build for test, as soon as their is a hardware test will go on
- They want to use the data bit to perform some slow control
- Issue is to find which bit we have to toggle
- See if a simulation mockup of their board can be build (using interfaces to the GBT only, without GBT cell for simplicity)
- A measurement must be done to check a resistor value to see what is going on with PLL
PCIe
(Pippo)
- No big news
- Simulation of the all user logic part is done
- Simulation will be included in the common git
- Currently trying to find ways to improve the error reporting of the PCIe core (with Tuan).
Integration
(Olivier, all)
- Developpement for all has switch to the develop branch of the pcoresng-cru, be aware to the new git, or your modifications will be lost
- QSYS phy were removed and regenerated, it seems it solved the compilation problem (clear procedure to be established by Pippo)
- So far what was understood, QSYS systems had to be regenerated
- hdlmake to create the list
- IP upgrade to systems
- Some work still to be done, to understand if it works from fresh clone
- The qsf file will be shared
Simulation
(Olivier)
- First simulation of the datapathwrapper done, address map understood, now a significant simulation has to be constructed
- Mazsi : Check the CRU-test scripts they can help
TPC meeting on friday
(all)
- For now Mazsi and Pippo will prepare the presentation
- For the future plan, Olivier will answer the questions
Production
- No information reported
- Pippo : Pressure on CRU hardware is very high, we need to provide informations to users
LAB
- Air conditionning is being connected today
- If not ready today, electronics will be powered up in old lab
AOB
- MCH has a review to come soon, they want to have a readout using a CRU in their lab.
Travels/vacations
Feb 10-13 : mazsi @ wigner
Feb 15-27 : mazsi on leav
Feb 15-16 : Olivier on leave
Feb 22-23 : Olivier on leave