FCC Calo weekly meeting

Europe/Zurich
42/R-014 (CERN)

42/R-014

CERN

6
Show room on map
  • Missing b-field in v01 simulation production
  • Anna showed updated plots for electron and photon resolutions with and without electronics noise
  • Tungsten absorber option of the inclined ECal was discussed, probably not realistic/feasible, but study will be included in CDR -> reduction of pile-up induced noise
  • Ricardo showed first measurements on Scintillator tiles + fibre + PMT readout
  • Lightyield shows expected behaviour in x (distance from fibre), uniformity achieved in ATLAS by blackened with paper
  • Impact of the length of the fibre on the light output as expected
  • Plan is to test realistic fibre length for FCC with SiPM readout, and actually start to setup a test stand of Sci+fibre+SiPM (Coralie will contact HGTD testbeam coordinator+CALICE contacts for guidance)
There are minutes attached to this event. Show them.