HL-LHC Inner Triplet BPMs conceptual design review
→
Europe/Zurich
866/2-D05 (CERN)
Description
The aim of the meeting is to check that
-
the absorption of particle debries and cooling are as required
-
the alignment references and precision are agreed
-
synergies of the Beam Screen and BPM design are optimum
-
the integration is possible and responsibilities are clear
-
the deliverable to the IT String test are agreed
-
the design of the BPM is sound and ready for detailed drawings
-
the planning up to date