Minutes from 3rd ALICE & VSC LS2 preparation meeting
Participants: Arturo Tauro <Arturo.Tauro@cern.ch>; Corrado Gargiulo <corrado.gargiulo@cern.ch>; Werner Riegler <Werner.Riegler@cern.ch>; Antonio Lafuente Mazuecos <antonio.lafuente@cern.ch>; Giuseppe Bregliozzi <Giuseppe.Bregliozzi@cern.ch>; Jerome Gilles Chaure <jerome.chaure@cern.ch>; Chiara Di Paolo <chiara.di.paolo@cern.ch>
1. LS2 planning update
2. LS2 Installation procedure
BVO will meet with Corrado and Antonio in order to discuss in detail new installation procedure for LS2 VC2C. Meeting scheduled for Tuesday 5th of June by Josef. Draft of the installation procedure by the end of June / beginning of July.
3. LS2 Coordination
Based on request of Marzia Bernardini, we need to present detail planning to the LHC coordination. Plan will contain all the details about the access on UX and machine side as well as information about cabling deadline and foreseen x-rays/survey inspections.
Post-meeting remark (JS): Meeting should takes place on 25th of June 15:30 at 112-4-B60.
4. Production update
Schedule still valid. VSC is working on acceptance of the NEG coating qualification samples (once finished, we send notification also to ALICE).
5. Annular ion pump VPIXB
As presented the annular ion pump has negligible effect on the vacuum performance in IP2.X. As the ALICE takes care about the secondary vertices close to the VVGMT manual valve, VSC propose to suppress the pump. We will keep the old pump as spare including drift chambers for both layouts (with and without the pump). ALICE will decide whether to keep it or drop it.
6. Non-baked IP study
In order to evaluate need of remote bake-out oven for beryllium part of the VC2C (bake-out during standard access regime - TPC in run position - no access on the omega platform and compensator side) BVO has performed the pressure profile simulations assuming the non-baked beryllium part (with saturated NEG). Results shows static pressure bellow 1e-10mbar which is still acceptable for the OP. BVO will study dynamic effect of upper mentioned. We will also investigate whether and how we can build the remote baking system, what are the risks and constraints. ALICE will decide whether the system is needed or not.
7. Next meetings
---- POST MEETING NOTES ---
A) Email from Arturo 07/06/2018
B) "LS2 detail schedule notes" (Josef Sestak)