Yesterday summary :
Upstream :
=========
ATLAS-MM : left until January, in preparation area for the moment (RP checked)
CMS-CSC small chamber hosted on LHCb setup at 3.5m
ALICE TPC at 2 m unshadowed
EP-DT2 : 5m next to CMS-RPC
CMS-RPC : Trolley 1 at 5m, Trolley 3 at 4m
Downstream :
==========
CMS-GEM 1+2 : 1m
EP-DT1 : 1.5 m
ATLAS-RPC : 2.5 m (back in bunker)
CMS-CSC 1 : 2.5 m
CMS-CSC 3 + LHCb : 5 m
CMS-DT : suffering from gas issue.
Filter scan :
=========
Upstream :
EP-DT2 : filter 100 for 6-7h starting at 9h
CMS-RPC : want 2.2 for whole week. 6.9 for two hours (after EP-DT)
CMS-RPC : 1-2h source off
ALICE : full field for 1h around 16h
Downstream :
CMS-DT: 5h in range 460-22
Access 1.5h planned after 17h.
Access on Friday : 1.5h afternoon