Yesterday summary :
Upstream :
=========
ATLAS-MM : left until January, in preparation area for the moment (RP checked)
CMS-CSC: small chamber hosted on LHCb setup at 3.5m
ALICE TPC at 2 m unshadowed
EP-DT2 : 5m next to CMS-RPC
CMS-RPC : Trolley 1 at 5m, Trolley 3 at 4m
Downstream :
==========
CMS-GEM 1+2 : 1m
EP-DT1 : 1.5 m
ATLAS-RPC : 2.5 m (back in bunker) + second trolley to be moved in soon
CMS-CSC 1 : 2.5 m
CMS-CSC 3 + LHCb : 5 m
CMS-DT :
Filter scan :
=========
Thu 06th - access at 2pm for 1.5h
Upstream :
EP-DT2: filter 100 for 3h starting at 3.30pm
CMS-RPC : want 2.2 for whole week
ALICE : full field for 1h around 10.30am
Downstream :
CMS-DT: 5h in range 460-22
============================================
Friday 07th: access of 1.5h in the afternoon
Upstream:
EP-DT2: 3 hours of source on with attenuation 1000 or more in the morning starting around 9am
Downstream:
CMS-DT will profit for having an attenuation 1000 upstream
=========================================================================
Monday 10th: access of 1h morning/afternoon depending on the results of the previous test (ALICE-TPC)