Yesterday summary : 

Upstream :

=========
ATLAS-MM : left until January, in preparation area for the moment (RP checked)
CMS-CSC: small chamber hosted on LHCb setup at 3.5m
ALICE TPC at 2 m unshadowed
EP-DT2 : 5m next to CMS-RPC
CMS-RPC : Trolley 1 at 5m, Trolley 3 at 4m
ATLAS-sTGC : 3.5m

Downstream :
==========
CMS-GEM 1+2 : 1m
EP-DT1 : 1.5 m
ATLAS-RPC : 2.5 m  (back in bunker)  + second trolley to be moved in soon
CMS-CSC 1 : 2.5 m
CMS-CSC 3 + LHCb : 5 m
CMS-DT : 

Filter scan :
=========

Upstream :

ALICE : full field for 1h  around 10.30am
CMS-RPC & ED-DT2: first 10000-1000-100 for 1h, then 6.9 for  2h starting 12h

Downstream :

CMS-DT:  12h filter scan for ≈ 1 h  460 until 22.

============================================

Access 1h today at 17h
Access tomorrow 17h for 1h
Access Monday  9h for 1h

=========================================================================