Current Situation
Upstream :
=========
CMS-CSC: small chamber hosted on LHCb setup at 3.5m (flushing, ready for Christmas)
ALICE TPC at 2 m unshadowed - out / back on 09.01.2019
EP-DT2 : 5m next to CMS-RPC (to be turned OFF soon)
CMS-RPC : Trolley 1 at 5m, Trolley 3 at 4m (Off since Tuesday)
ATLAS-sTGC : 3.5m - (CO2 flushing, HV OFF)
Downstream :
==========
CMS-GEM 1+2 : 1m (to be checked)
EP-DT1 : 1.5 m (to be turned OFF soon)
ATLAS-RPC : 2.5 m (test for 1-2h, then we will be off)
+ second trolley near downstream wall (already OFF)
CMS-CSC 1 : 2.5 m (Ready for Christmas)
CMS-CSC 3 + LHCb : 5 m (Ready for Christmas)
CMS-DT : finishing dose measurement today. Followed by usual Thursday scan. Then Scan with dosimeter.
Gas Supply : Change to Christmas flushing conditions this afternoon.
We will try to put a logbook entry.
Source will be interlocked tomorrow around lunchtime.